Ajax loader
Collection: Rainbow Warrior III (GP028JB)
Page
of 290
A selection of images showing the design,...
ID: GP02HBT
Rainbow Warrior III Construction
The hull of the new Rainbow Warrior III on dry ground at the Fassmer Shipyard in Berne. The ship is being prepared to be lifted into the water. The Rainbow Warrior is Greenpeace's first purpose-built vessel, and will be officially launched in Autumn 2011.
07/04/2011
Locations:
Maximum size: 3378 X 2252 px
Shoot:
Construction progress of the new Greenpeace ship Rainbow Warrior III at the Maritim Shipyard in Gdansk, Poland and at the Fassmer Shipyard in Berne, Germany. The shoot includes images from the beginning of the construction in the summer of 2010 through to its completion in July 2011.
Page
of 290