Ajax loader

Wind Farm in Fukushima 

Wind Farm in Fukushima 

Shoot 
GP0STQF56 
08/25/2016 
At one of the biggest wind farms in Fukushima prefecture, Japan, 33 wind turbines are producing electricity equivalent to power demands of 35,000 households’ demands per year. Fukushima prefecture has declared to become 100% renewable by 2040. After the Fukushima nuclear disaster, Feed in Tariff scheme was installed in 2012. Since then renewable energy, mainly photovoltaic, has grown massively however, wind capacity hasn’t grown so much and remains 3GW in 2015. 
Wind Farm in Fukushima
25 August, 2016 
GP0STQF58 
★★★★★★★ (A) 
Wind Farm in Fukushima
25 August, 2016 
GP0STQF57 
★★★★ (E) 
Wind Farm in Fukushima
25 August, 2016 
GP0STQF59 
★★★★★★ (B) 
Wind Farm in Fukushima
25 August, 2016 
GP0STQF5B 
★★★★ (E) 
Wind Farm in Fukushima
25 August, 2016 
GP0STQF5A 
★★★★ (E) 
Wind Farm in Fukushima
25 August, 2016 
GP0STQF5C 
★★★★ (E) 
Wind Farm in Fukushima
25 August, 2016 
GP0STQF5F 
★★★★ (E) 
Wind Farm in Fukushima
25 August, 2016 
GP0STQF5D 
★★★★★★ (B) 
Wind Farm in Fukushima
25 August, 2016 
GP0STQF5E 
★★★★ (E) 
Wind Farm in Fukushima
25 August, 2016 
GP0STQF5G 
★★★★ (E) 
Wind Farm in Fukushima
25 August, 2016 
GP0STQF5H 
★★★★ (E) 
Wind Farm in Fukushima
25 August, 2016 
GP0STQF5I 
★★★★★★★ (A) 
Wind Farm in Fukushima
25 August, 2016 
GP0STQF5J 
★★★★ (E) 
Wind Farm in Fukushima
25 August, 2016 
GP0STQF5K 
★★★★ (E) 
Wind Farm in Fukushima
25 August, 2016 
GP0STQF5L 
★★★★ (E) 
Filters